
The VIP entrance ramps of the Twin Towers of the Union of Chambers and Commodity Exchanges of Turkey (TOBB) located close to the Ankara-Eskişehir highway are installed with a snow-ice melting and frost preventing system that uses tire track technique. The tire track system is applied based on the calculations of the distance between the axles of automobiles and it functions automatically according to weather conditions.